Workflow for network activity confirmation CN25

$
0
0

Dear Experts,

 

In CN25 tcode for network i am giving the input and pressing save button. In that tcode there are three activity status namely partial confirmation, manual confirmation and confirmation i.e PCNF, MCNF and CNF. I am using BO AFVC_NETW to trigger my workflow. As per workflow design i have given CNF, PCNF, MCNF as starting events. So when any one of the status gets from CN25 my workflow will trigger. Also at a time only one status has to be set. But when i press save button in CN25 its triggering all the three statuses. This is quite surprising. How are three statuses set at same time ? So three workitems are generated for all three start events.

 

I used SWU_OBUF and checked again but still all three statuses are set. Is it problem with BO or problem with Project System (PS) if any for that tcode.


Viewing all articles
Browse latest Browse all 995

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>